User Tools

Site Tools


module:project:partslist:list

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
module:project:partslist:list [2014/08/22 17:28]
target
module:project:partslist:list [2014/09/04 15:42] (current)
target
Line 19: Line 19:
  
 Project Managers (PM) are in charge of maintaining a parts list record in the web system for use in preparation job order or inventory order. Project Managers (PM) are in charge of maintaining a parts list record in the web system for use in preparation job order or inventory order.
 +
 +**Forms:**
 +
 +Cost Sheet - an excel template use for breaking down project materials or parts to come up with a project part list and project cost; parts list generated from cost sheet is copied in system parts list as requirement in preparation job order and forecasting report
  
 **General Procedure/Instruction:** **General Procedure/Instruction:**
Line 75: Line 79:
  
 d.3. click "Post" to use it in preparation job order (for case d.2.a&b) or in generating a forecast (case d.2.c) d.3. click "Post" to use it in preparation job order (for case d.2.a&b) or in generating a forecast (case d.2.c)
-  
        
 **Notes:** **Notes:**
 +
 +Parts list Status are as follows:
 +
 +Draft - the list of items if being finalized
 +
 +On Offer - parts list is being offered to or reviewed by client
 +
 +Final- parts list is confirmed by client
 +
 +Cancelled - parts list cancelled by sender due to reasonable reasons
  
 Parts list will not be allowed for revision when either condition is true: Parts list will not be allowed for revision when either condition is true:
module/project/partslist/list.1408699712.txt.gz ยท Last modified: 2014/08/22 17:28 by target