User Tools

Site Tools


module:project:partslist:list

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
module:project:partslist:list [2014/07/24 17:58]
target
module:project:partslist:list [2014/09/04 15:42] (current)
target
Line 19: Line 19:
  
 Project Managers (PM) are in charge of maintaining a parts list record in the web system for use in preparation job order or inventory order. Project Managers (PM) are in charge of maintaining a parts list record in the web system for use in preparation job order or inventory order.
 +
 +**Forms:**
 +
 +Cost Sheet - an excel template use for breaking down project materials or parts to come up with a project part list and project cost; parts list generated from cost sheet is copied in system parts list as requirement in preparation job order and forecasting report
  
 **General Procedure/Instruction:** **General Procedure/Instruction:**
Line 40: Line 44:
 b.2. copy the columns (item code, total qty, description) and paste to the importing template or sheet b.2. copy the columns (item code, total qty, description) and paste to the importing template or sheet
  
-b.3. high-light the pasted details +b.3. high-light the column headers down the last item of the pasted details 
  
 b.4. run the macro (macro name:?) (the macro will create a CSV data in noted pad) b.4. run the macro (macro name:?) (the macro will create a CSV data in noted pad)
Line 62: Line 66:
 c.2. revise or update to reflect current information (also see D. Finalizing a Parts List Record) c.2. revise or update to reflect current information (also see D. Finalizing a Parts List Record)
  
-c.3. click "save"+c.3. click "save"LOL
  
 **D. Finalizing a Parts List Record** **D. Finalizing a Parts List Record**
Line 75: Line 79:
  
 d.3. click "Post" to use it in preparation job order (for case d.2.a&b) or in generating a forecast (case d.2.c) d.3. click "Post" to use it in preparation job order (for case d.2.a&b) or in generating a forecast (case d.2.c)
-  
        
 **Notes:** **Notes:**
 +
 +Parts list Status are as follows:
 +
 +Draft - the list of items if being finalized
 +
 +On Offer - parts list is being offered to or reviewed by client
 +
 +Final- parts list is confirmed by client
 +
 +Cancelled - parts list cancelled by sender due to reasonable reasons
  
 Parts list will not be allowed for revision when either condition is true: Parts list will not be allowed for revision when either condition is true:
module/project/partslist/list.1406195893.txt.gz ยท Last modified: 2014/07/24 17:58 by target