User Tools

Site Tools


module:joborder:preparation:profile

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
module:joborder:preparation:profile [2017/11/23 15:10]
target
module:joborder:preparation:profile [2018/09/11 15:45] (current)
target
Line 11: Line 11:
  
 **JO number – system generated record number (JO01 is a preparation type) **JO number – system generated record number (JO01 is a preparation type)
 +
  
 * Date – date of registration as draft * Date – date of registration as draft
Line 17: Line 18:
  
 * Part list – reference PL number for material selection * Part list – reference PL number for material selection
 +
  
 * Project Title – reference title of PIN * Project Title – reference title of PIN
 +
  
 * Client code – reference client of PIN * Client code – reference client of PIN
 +
  
 *PM – officer in charge of the project *PM – officer in charge of the project
 +
  
 *Status – status of job order; see status names *Status – status of job order; see status names
 +
  
 *Remarks – additional notes or special instructions *Remarks – additional notes or special instructions
 +
  
 *For PD – yes or no option related to the type of JO selected; yes would require JO-delivery before saving *For PD – yes or no option related to the type of JO selected; yes would require JO-delivery before saving
 +
  
 *PO no. – reference client P.O. number or conforme  *PO no. – reference client P.O. number or conforme 
 +
  
 *Due date – expected deadline of preparation; usually 3 days upon JO or on or before due date *Due date – expected deadline of preparation; usually 3 days upon JO or on or before due date
 +
  
 *Department – department in charge of the JO *Department – department in charge of the JO
 +
  
 *Prepared by – reporting officer in charge of actual preparation *Prepared by – reporting officer in charge of actual preparation
 +
  
 *Checked by – reporting officer in charge of checking and reporting prepared materials *Checked by – reporting officer in charge of checking and reporting prepared materials
 +
  
 *Prepared Date – date when actual preparation was done *Prepared Date – date when actual preparation was done
 +
  
 *Stored to – location name where prepared materials are temporarily stored *Stored to – location name where prepared materials are temporarily stored
 +
  
 *No. of Pallet used – number of pallet used to store the prepared items *No. of Pallet used – number of pallet used to store the prepared items
 +
      
 *Auto fill – fills preparation quantity with requested quantity for easier reporting *Auto fill – fills preparation quantity with requested quantity for easier reporting
 +
  
 *Item Group –item sorting according to PM *Item Group –item sorting according to PM
 +
  
 *Item Code – reference item code of item on preparation *Item Code – reference item code of item on preparation
 +
  
 *WHSE – assigned warehouse from where to get the listed item *WHSE – assigned warehouse from where to get the listed item
 +
  
 *Item Class – assigned class from where to get the listed item *Item Class – assigned class from where to get the listed item
 +
  
 *Requested Quantity – quantity per item for preparation *Requested Quantity – quantity per item for preparation
 +
  
 *Prepared QTY – served quantity per item *Prepared QTY – served quantity per item
 +
  
 *Added Process – additional process that can be handled with-in warehouse *Added Process – additional process that can be handled with-in warehouse
 +
  
 *DR Description – item name, specs and color or any text to use as delivery receipt’s item description *DR Description – item name, specs and color or any text to use as delivery receipt’s item description
 +
  
 *DR Qty – item quantity to use as delivery receipt’s quantity *DR Qty – item quantity to use as delivery receipt’s quantity
 +
  
 *Line Remarks – additional notes about the item on preparation *Line Remarks – additional notes about the item on preparation
 +
  
 Important notes:** Important notes:**
module/joborder/preparation/profile.1511421040.txt.gz · Last modified: 2017/11/23 15:10 by target