This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
module:joborder:preparation:profile [2014/04/22 18:13] target |
module:joborder:preparation:profile [2018/09/11 15:45] (current) target |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Preparation Profile (Preparation Job Order) ====== | ====== Preparation Profile (Preparation Job Order) ====== | ||
+ | |||
This section is the Preparation Profile. This form contains the fields for creating a Preparation record for job ordering. | This section is the Preparation Profile. This form contains the fields for creating a Preparation record for job ordering. | ||
- | Overview: Preparation Profile states information about the job order. such as, | ||
- | | + | **Overview:** |
- | | + | |
- | * Project No. – reference project number of the job order | + | |
- | * Part list – reference PL number for material selection | + | |
- | * Project Title – reference title of PIN | + | |
- | * Client code – reference client of PIN | + | |
- | * PM – officer in charge of the project | + | |
- | * Status – status of job order; see [[module:joborder: | + | |
- | * Remarks – additional notes or special instructions | + | |
- | * For delivery JO – yes or no option related to the type of JO selected; yes would require JO-delivery before saving | + | |
- | * Due date – expected deadline of preparation; | + | |
- | * Department – reference department | + | |
- | * Prepared by – reporting officer in charge of actual preparation | + | |
- | * Checked by – reporting officer in charge of checking and reporting prepared materials | + | |
- | * Prepared Date – date when preparation was done | + | |
- | * Stored to – location name where preparation is temporarily kept | + | |
- | * Auto fill prepared quantity – fills preparation quantity with requested quantity for reporting | + | |
- | * Warehouse – assigned warehouse from where to get the listed item | + | |
- | * Item Class – assigned class from where to get the listed item | + | |
- | * Requested Quantity – quantity per item for preparation | + | |
- | * Prepared Quantity – served quantity per item | + | |
- | * Added Process – additional process that can be handled with-in warehouse | + | |
- | * DR Description – item name to use in delivery receipt’s item description | + | |
- | | + | |
- | | + | |
- | Important notes: | + | Preparation Profile states information about the job order. such as, |
+ | |||
+ | |||
+ | **JO number – system generated record number (JO01 is a preparation type) | ||
+ | |||
+ | |||
+ | * Date – date of registration as draft | ||
+ | |||
+ | * Project No. – reference project number of the job order | ||
+ | |||
+ | * Part list – reference PL number for material selection | ||
+ | |||
+ | |||
+ | * Project Title – reference title of PIN | ||
+ | |||
+ | |||
+ | * Client code – reference client of PIN | ||
+ | |||
+ | |||
+ | *PM – officer in charge of the project | ||
+ | |||
+ | |||
+ | *Status – status of job order; see status names | ||
+ | |||
+ | |||
+ | *Remarks – additional notes or special instructions | ||
+ | |||
+ | |||
+ | *For PD – yes or no option related to the type of JO selected; yes would require JO-delivery before saving | ||
+ | |||
+ | |||
+ | *PO no. – reference client P.O. number or conforme | ||
+ | |||
+ | |||
+ | *Due date – expected deadline of preparation; | ||
+ | |||
+ | |||
+ | *Department – department in charge of the JO | ||
+ | |||
+ | |||
+ | *Prepared by – reporting officer in charge of actual preparation | ||
+ | |||
+ | |||
+ | *Checked by – reporting officer in charge of checking and reporting prepared materials | ||
+ | |||
+ | |||
+ | *Prepared Date – date when actual preparation was done | ||
+ | |||
+ | |||
+ | *Stored to – location name where prepared materials are temporarily stored | ||
+ | |||
+ | |||
+ | *No. of Pallet used – number of pallet used to store the prepared items | ||
+ | |||
+ | |||
+ | *Auto fill – fills preparation quantity with requested quantity for easier reporting | ||
+ | |||
+ | |||
+ | *Item Group –item sorting according to PM | ||
+ | |||
+ | |||
+ | *Item Code – reference item code of item on preparation | ||
+ | |||
+ | |||
+ | *WHSE – assigned warehouse from where to get the listed item | ||
+ | |||
+ | |||
+ | *Item Class – assigned class from where to get the listed item | ||
+ | |||
+ | |||
+ | *Requested Quantity – quantity per item for preparation | ||
+ | |||
+ | |||
+ | *Prepared QTY – served quantity per item | ||
+ | |||
+ | |||
+ | *Added Process – additional process that can be handled with-in warehouse | ||
+ | |||
+ | |||
+ | *DR Description – item name, specs and color or any text to use as delivery receipt’s item description | ||
+ | |||
+ | |||
+ | *DR Qty – item quantity to use as delivery receipt’s quantity | ||
+ | |||
+ | |||
+ | *Line Remarks – additional notes about the item on preparation | ||
+ | |||
+ | |||
+ | Important notes:** | ||
Posting JO is like sending email job order to warehouse but according to specific task or JO type. Posting makes JO-preparation’s reference parts list non-editable. | Posting JO is like sending email job order to warehouse but according to specific task or JO type. Posting makes JO-preparation’s reference parts list non-editable. | ||
- | It is a system control that each parts list item referred in JO preparation to have one item from one warehouse and with one reference item class in one JO-preparation. This implies that if one item will require serving from different | + | It is a system control that each parts list item referred in JO preparation to have one item from one warehouse and with one reference item class in one JO-preparation. This implies that if one item will require serving from different |
+ | |||
+ | Follow this link to see [[module: |