This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
module:joborder:joborder:list [2014/08/15 17:24] target |
module:joborder:joborder:list [2019/12/04 17:32] (current) target |
||
---|---|---|---|
Line 19: | Line 19: | ||
**User Involve:** | **User Involve:** | ||
- | Operations (Project Manager & Supply Chain) are responsible for initiating a job order to be processed and reported by warehouse team in accordance with the JO type and the given instruction. Both are in charge of maintaining a transparent and accurate job order system. | + | Operations (Project Manager & Supply Chain) are responsible for initiating a job order to be processed and reported by warehouse team in accordance with the JO type and the given instruction. Both are in charge of maintaining a transparent and accurate job order system. In case Job order' |
**General Procedure/ | **General Procedure/ | ||
Line 29: | Line 29: | ||
a.2. choose JO type that best fit the order you need to accomplish | a.2. choose JO type that best fit the order you need to accomplish | ||
- | a.2.1. JO Preparation - choose this to prepare items in advance | + | a.2.a. JO Preparation - choose this to prepare items in advance |
- | a.2.2. JO Delivery - choose this to prepare previously prepared items | + | |
- | a.2.3. JO Preparation-Delivery - choose this to prepare items and deliver consecutively | + | a.2.b. JO Delivery - choose this to prepare previously prepared items |
- | a.2.4. JO Delivery-Service - choose this to deliver and install previously prepared items consecutively | + | |
- | a.2.5. JO Preparation-Delivery-Service - choose this to prepare, deliver and install items consecutively | + | a.2.c. JO Preparation-Delivery - choose this to prepare items and deliver consecutively |
- | a.2.6. JO Service - choose this to render services on site w/ or w/o previously delivered items | + | |
- | a.2.7. JO Receiving - choose this to receive imported items on the given schedule | + | a.2.d. JO Delivery-Service - choose this to deliver and install previously prepared items consecutively |
- | a.2.8. JO Back-load - choose this to pull-out previously delivered items | + | |
- | a.2.9. JO Transfer - choose this to move items between two authorize transfer locations | + | a.2.e. JO Preparation-Delivery-Service - choose this to prepare, deliver and install items consecutively |
- | a.2.10. JO Inventory Count - choose this to conduct physical count or cycle count | + | |
+ | a.2.f. JO Service - choose this to render services on site w/ or w/o previously delivered items | ||
+ | |||
+ | a.2.g. JO Receiving - choose this to receive imported items on the given schedule | ||
+ | |||
+ | a.2.h. JO Back-load - choose this to pull-out previously delivered items | ||
+ | |||
+ | a.2.i. JO Transfer - choose this to move items between two authorize transfer locations | ||
+ | |||
+ | a.2.j. JO Inventory Count - choose this to conduct physical count or cycle count | ||
a.3. fill up the information needed in the header and detail (vary per JO type) | a.3. fill up the information needed in the header and detail (vary per JO type) | ||
Line 107: | Line 116: | ||
* Complete - job order objectives were met as reported by warehouse | * Complete - job order objectives were met as reported by warehouse | ||
* Cancelled - job order is cancelled by sender due to reasonable reasons | * Cancelled - job order is cancelled by sender due to reasonable reasons | ||
+ | |||
+ | **Accounting Control Features:** | ||
+ | |||
+ | These features can be encountered on selected part of the system which prevents further processing of the transaction. | ||
+ | |||
For information about specific Job order type please see about of corresponding job order. | For information about specific Job order type please see about of corresponding job order. | ||