This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
module:inventory:directdeliveryreport:list [2016/01/14 16:51] target |
module:inventory:directdeliveryreport:list [2016/02/11 17:51] (current) target |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== |
**Overview: | **Overview: | ||
- | Direct | + | Mobile |
**Definition of Terms:** | **Definition of Terms:** | ||
- | Direct | + | Mobile |
- | Direct | + | Mobile |
- | Direct | + | Mobile |
**User Involve:** | **User Involve:** | ||
- | Project Manager is responsible for instructing (written or verbal) Warehouse to create and exercise the use of Direct | + | Project Manager is responsible for instructing (written or verbal) Warehouse to create and exercise the use of Mobile |
**Forms:** | **Forms:** | ||
- | Direct | + | Mobile |
Delivery Receipt - the accounting form used to list the actual items delivered to and received by the client | Delivery Receipt - the accounting form used to list the actual items delivered to and received by the client | ||
Line 24: | Line 24: | ||
**General Procedure/ | **General Procedure/ | ||
- | **A. Creating, Serving and Report a Direct | + | **A. Creating, Serving and Report a Mobile |
- | a.1. receive instruction from PM to deliver items using DDR (Both must know that using Direct | + | a.1. receive instruction from PM to deliver items using MDJO (Both must know that using Mobile |
a.2. identify the reference PIN or Project details of items to be delivered | a.2. identify the reference PIN or Project details of items to be delivered | ||
Line 36: | Line 36: | ||
a.5. load items to delivery Truck | a.5. load items to delivery Truck | ||
- | a.6. open blank DDR and fill up the information needed on the header | + | a.6. open blank MDJO and fill up the information needed on the header |
- | a.7. set DDR to " | + | a.7. set MDJO to " |
a.8. Print DR and dispatch delivery truck | a.8. Print DR and dispatch delivery truck | ||
Line 46: | Line 46: | ||
a.10. Check completeness, | a.10. Check completeness, | ||
- | a.11. Update | + | a.11. Update |
- | a. . Print MIR and attach together with accounting' | + | a. . Print MIR and attach together with accounting' |
**B. Revision or Cancellation** | **B. Revision or Cancellation** | ||
- | B.1. identify the DDR for revision/ | + | B.1. identify the MDJO for revision/ |
- | B.2. check DDR status | + | B.2. check MDJO status |
- | if DDR status: | + | if MDJO status: |
- | * -draft: any WH can revise/ | + | * -draft: any WH can revise/ |
- | * -new: WH roll back status to draft to allow any to revise/ | + | * -In-Transit: |
- | * -In-Transit: | + | * -Delivered: if error found in this stage: first, make sure that Printed DR and MIR is not yet submitted to accounting. Then, cancel |
- | * -Delivered: if error found in this stage: first, make sure that Printed DR and MIR is not yet submitted to accounting. Then, cancel | + | |
note: Cancelled DR should also be submitted to Accounting | note: Cancelled DR should also be submitted to Accounting | ||
Line 67: | Line 66: | ||
**Notes:** | **Notes:** | ||
- | For information about Direct | + | For information about Mobile |