This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
module:inventory:directdeliveryreport:list [2016/01/14 15:53] target created |
module:inventory:directdeliveryreport:list [2016/02/11 17:51] (current) target |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== |
**Overview: | **Overview: | ||
- | Direct | + | Mobile |
**Definition of Terms:** | **Definition of Terms:** | ||
- | Direct | + | Mobile |
- | Direct | + | Mobile |
- | Direct | + | Mobile |
**User Involve:** | **User Involve:** | ||
- | Project Manager is responsible for instructing (written or verbal) Warehouse to create and exercise the use of Direct | + | Project Manager is responsible for instructing (written or verbal) Warehouse to create and exercise the use of Mobile |
**Forms:** | **Forms:** | ||
- | Direct | + | Mobile |
Delivery Receipt - the accounting form used to list the actual items delivered to and received by the client | Delivery Receipt - the accounting form used to list the actual items delivered to and received by the client | ||
Line 24: | Line 24: | ||
**General Procedure/ | **General Procedure/ | ||
- | **A. Creating | + | **A. Creating, Serving |
- | a.1. receive instruction from PM to deliver items using Direct Delivery Report | + | a.1. receive instruction from PM to deliver items using MDJO (Both must know that using Mobile |
- | a.2. identify the reference PIN of items to be delivered | + | a.2. identify the reference PIN or Project details |
- | a.3. open blank Direct Delivery Report and fill up the information needed in the header | + | a.3. identify |
- | a.4. list identified | + | a.4. prepare |
- | a.5. load items to delivery Truck then set Direct Delivery Report to " | + | a.5. load items to delivery Truck |
- | a.6. Print DR | + | a.6. open blank MDJO and fill up the information needed on the header |
- | **D. Reporting | + | a.7. set MDJO to " |
- | please see [[module: | + | a.8. Print DR and dispatch delivery truck |
- | **E. Revision or Cancellation** | + | a.9. Monitor and collect Client Signed Printed DR |
- | e.1. identify the job order for revision/ | + | a.10. Check completeness, |
- | e.2. check JO status | + | a.11. Update MDJO in the system by filling up required fields and post status |
- | if JO status: | + | a. . Print MIR and attach together with accounting' |
- | * -draft: any PM can revise/ | + | |
- | * -new:any PM can revise/ | + | |
- | * -on-going: inform warehouse regarding revision/ | + | |
- | * note: check for related JO preparation | + | |
- | * -reported complete/ | + | |
- | e.3. click " | + | **B. Revision |
- | **Notes:** | + | B.1. identify the MDJO for revision/ |
- | All type Job orders have the same status naming convention but may differ in meaning. | + | B.2. check MDJO status |
- | Preparation Status are as follows: | + | if MDJO status: |
+ | * -draft: any WH can revise/ | ||
+ | * -In-Transit: | ||
+ | * -Delivered: if error found in this stage: first, make sure that Printed DR and MIR is not yet submitted to accounting. Then, cancel MDJO and create new with correct details (Reprinting of DR may not be necessary, if reprinting is needed cancel existing and print new and have revised DR signed by client) | ||
+ | note: Cancelled DR should also be submitted to Accounting | ||
- | * Draft - the list of items to be delivered is being finalized | + | e.3. click " |
- | * New - delivery job order details are final and sent to warehouse for execution | + | |
- | * On-going - job order was acknowledged by warehouse and listed items are being loaded or in-transit | + | **Notes:** |
- | | + | |
- | | + | |
- | | + | |
- | Notes: | + | For information about Mobile Delivery JO please see MDJO [[module:inventory: |
- | For information about delivery job order profile please see [[module: | ||
- | Delivery JO is for giving order to deliver prepared materials of selected project base on selection of reported preparation job order as issuance basis of delivery quantity. Delivery completes until delivered quantity in delivery report matches requested prepared quantity. Reported delivered quantity will be the items allowed for backload job order in case the need arises. |